Skip to content

The Making of Anthony’s New Room


Before


Ripping out closet and cabinets

Need to extend lift track 9 feet

Putting up walls

Installing door

Installing drywall, inside room

Outside wall

New track section installed, modifying door for lift system

tedious plastering and sanding

Painting

Making use of extra kitchen cabinets for storage

Wall Decals

Curtain to hide access to water heater closet

New kitchen wall with iron decor that papa made

Final touch, Anthony’s new electric bed

Share

2 thoughts on “The Making of Anthony’s New Room

  1. george says:

    You are rocking the renovations for Anthony. He is a lucky fellow. Well done.

    Reply
  2. Cindy says:

    Thanks George. We finally decided to build a room for him on the first floor. Makes life easier for all.

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *